MRT Train Head Design Needs Improvement
access_time January 17 2017 06:14 PM remove_red_eye 2544
Reported by Rudi Hermawan | Translated by Maria Inggita
Reported by Rudi Hermawan | Translated by Maria Inggita
Acting Jakarta Governor, Sumarsono, gave a proposal about Mass Rapid Transit (MRT) train design. He thinks that nowadays train is aerodynamics-less.
Now's shape is too standard, we want it more aerodynamics and better
"Now's shape is too standard, we want it more aerodynamics and better," said Sumarsono, Monday (1/16).
For that, his side will invite manufacturer to discuss about re-design, if it is not possible to make a total transformation.
MRT Project Can Finish On TimeNext, he hoped that this transformation will not disturb MRT's operation schedule in March 2019.
Meanwhile, Director of PT. MRT Jakarta, William P. Sabandar said that this transformation is for betterment of Jakarta. Moreover, it is still the first design. Deadline to be given to change the design in of this month.
"It will be produced massively right after the design is agreed," he closed.